{"id":814,"date":"2025-12-15T15:28:05","date_gmt":"2025-12-15T15:28:05","guid":{"rendered":"https:\/\/boreaconstruction.com\/?post_type=project&#038;p=814"},"modified":"2025-12-17T21:49:36","modified_gmt":"2025-12-17T21:49:36","slug":"projet-hand-hills","status":"publish","type":"project","link":"https:\/\/boreaconstruction.com\/en\/project\/projet-hand-hills\/","title":{"rendered":"Hand Hills"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The Hand Hills Wind Project is located on a private land in the Municipal Districts of Starland County and Special Areas No. 2, approximately 6 km Southeast of the Village of Delia, and approximately 28 km Northeast of Drumheller, AB. The Project includes 29 Siemens Gamesa SG 5.0-145 wind turbine generators (\u201cWTGs\u201d) with a 95.5m hub height to achieve a total nameplate capacity of up to 145MW. BluEarth Renewables is the developer, owner and operator of the Hand Hills Wind Project.<\/p>","protected":false},"featured_media":815,"template":"","meta":{"_acf_changed":true},"categories":[7],"class_list":["post-814","project","type-project","status-publish","has-post-thumbnail","hentry","category-energie-eolienne"],"acf":[],"_links":{"self":[{"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/project\/814","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/media\/815"}],"wp:attachment":[{"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/media?parent=814"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/categories?post=814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}