{"id":937,"date":"2026-01-08T20:35:56","date_gmt":"2026-01-08T20:35:56","guid":{"rendered":"https:\/\/boreaconstruction.com\/?post_type=project&#038;p=937"},"modified":"2026-02-06T21:13:10","modified_gmt":"2026-02-06T21:13:10","slug":"projet-sharp-hills","status":"publish","type":"project","link":"https:\/\/boreaconstruction.com\/en\/project\/projet-sharp-hills\/","title":{"rendered":"Sharp Hills Wind"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The Sharp Hills Wind Project is located in Special Area 3 and 4 near the hamlets of Sedalia and New Brigden, in Alberta. The project area is primarily used for grain farming and cattle grazing, which consists mainly of flat plains and rolling hills. Sharp Hills Wind Farm has a mixed layout utilizing 67 Vestas V150 turbines rated at 4.3 MW and 4.5 MW and has an installed capacity of 300MW. Sharp Hills\u2019 generation is equivalent to the consumption of more than 160,000 Alberta homes.<\/p>","protected":false},"featured_media":938,"template":"","meta":{"_acf_changed":true},"categories":[7],"class_list":["post-937","project","type-project","status-publish","has-post-thumbnail","hentry","category-energie-eolienne"],"acf":[],"_links":{"self":[{"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/project\/937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/media\/938"}],"wp:attachment":[{"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/media?parent=937"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/boreaconstruction.com\/en\/wp-json\/wp\/v2\/categories?post=937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}